Wellhead Electric Company, Inc. Privately held Est. 1982
N 38.5816° · W 121.4944° · Sacramento, CA · (916) 447-5171
The Energy Industry Innovators

Dispatchable power for California.

A privately held developer and operator of energy generation and storage facilities. Forty years of designing, permitting, building, and running the assets that keep the grid firm.

FIG. 01 — Stanton Energy Reliability Center, Orange County · COD 2020
600MW
Capacity developed
1982
Operating since
08
Active facilities
98%
Fleet availability
Index 01 — Capabilities

What we do.

Six disciplines under one roof — development, permitting, construction, operations, maintenance, and the research that keeps a forty-year-old fleet relevant for another forty.

Index 02 — The Fleet

Active facilities.

Eight operating facilities across three California air districts. Every megawatt developed by Wellhead is still operated by Wellhead.

No.FacilityLocationTypeCODCapacity
01
Stanton Energy Reliability CenterOrange CountyHybrid EGT202098 MW
02
Stanton Battery Energy StorageOrange CountyBESS202026 MW
03
Chula Vista Energy CenterSan Diego CountyPeaker200945 MW
04
El Cajon Energy CenterSan Diego CountyPeaker201745 MW
05
Escondido Energy CenterSan Diego CountyPeaker200945 MW
06
Delano Energy CenterKern CountyCogen201049 MW
Continued: Yuba City Cogeneration (44 MW, 1989) · Fresno Cogeneration Partners (57 MW, 1988) View all 8 facilities →

Forty years.
One operator.

The crew that develops the asset is the crew that permits it, builds it, and operates it for the next thirty years. Continuity is the product.

Start a conversation →
Index 03 — Recognition

Industry awards.

Selected recognition for engineering, emissions performance, and innovation in dispatchable hybrid operation.

S&P Platts Finalist 2021 ESNA 2017 Power Magazine 2021 AQMD 2017 EEI 2017